Skip to content

Sheetrock is hung! – House Build

Posted in House build

Sheetrock is Hung!

Even with all of the rain and flooding they were able to get the Sheetrock up and hung. The spaces are starting to take shape. We especially love all of the archways that we added and the windows that bring in the natural light and connect to the outdoors. Slowly but surely this will be home soon. These guys hung the Sheetrock in only 1 day! It amazing the way these things come together so quickly when you have the right people doing the job. You can tell right off when you have people that know exactly what they are doing.Next up floating and taping!

Sheetrock is Hung from Kitchen to Living
From Kitchen to Living Room
Sheetrock is Hung Master Bath
Master Bath
Sheetrock is Hung Guest Room
Guest Room
Sheetrock is Hung Front Entry
Front Entry
Sheetrock is Hung Dining Area
Dining Area

Sheetrock Hung Master Bedroom
Master Bedroom


2 Comments

  1. It’s going to be awesome! Did they add the stone to the columns on the porches?

    June 5, 2016
    |Reply
    • Aaron
      Aaron

      Not yet. It has been raining like crazy down here. The stone has been delivered but it has not been installed. All of the Columns will have a base of stone.

      June 5, 2016
      |Reply

Share Your Thoughts!

%d bloggers like this: